Ecovert FM
Company Profile | Services | Notice Board | Human Resources | Links | Contracts | Contact Us
0

 

Click here for a PDF version of this page


Building
FRANCE
Courbevoie

LEONARDO DA VINCI
UNIVERSITY COLLEGE

General description

Within the scope of a design-and-build contract, construction of a 106,000 m 2 , 5000-student university college with a teaching and administrative staff of 1,000.

Work carried out

  • A 10-storey fully air-conditioned teaching block.
  • Three geometrically shaped "OBJECT" buildings extend away from the teaching facilities:
    • an oval block (library),
    • a cube (offices),
    • two overlapping parallelepipeds (laboratories).
  • A two-level 130 metre long internal walkway covered by a glass roof.

All buildings are supported by a four-level podium incorporating: student halls and restaurants, an internal walkway, eleven lecture theatres and three 600-space parking levels located within the substructure.



Construction dates: 1993-1994
Completion time: 21months


Contracting Group
BOUYGUES BÂTIMENT
DUMEZ

Client
CONSEIL GÉNÉRAL
DES HAUTS-DE-SEINE

Engineer
SECHAUD ET BOSSUYT

Architect
VALODE ET PISTRE


Key figures

  • Gross area: 106,000 m2
  • Concrete: 40,000 m3
  • Floor area: 100,000 m2
  • Earthworks: 85,000 m3
  • Steel (all types): 2,000 t

   
   

Company Profile | Services | Notice Board | Human Resources | Links | Contracts | Contact Us
This website is maintained by webmaster@ecovertfm.co.uk